ARITCO 9000 TRAILING CABLE REPLACEMENT

WHAT THE JOB INVOLVED
Trailing cable replacement on an Aritco 9000 platform lift. The original cable was inspected, removed, and replaced before the lift was tested and returned to service.
RESULT
Lift returned to safe, reliable service.
ON SITE

Service
Manufacturer
SIMILAR JOBS
CommercialAritco Platform Lift: Manual to Automatic Door Conversion
Door upgrade on an Aritco Platform Lift, converting manual doors to fully automatic door operators across all three floors. The install was completed with minimal downtime, leaving the lift with seamless automatic door operation and improved accessibility for everyone using it.
Read the job
CommercialBarduva SB200 Inverter Replacement
Inverter replacement on a Barduva SB200 lift. The faulty inverter was removed, the new unit fitted and wired in, and a full calibration run completed before the lift was tested and returned to service.
Read the job
CommercialMotala MC2000 Gearbox Replacement
Full gearbox replacement on a Motala MC2000 lift. After isolating the lift and securing it at the top floor, the motor and original gearbox were removed, all key surfaces cleaned and re-greased, and the new gearbox installed. The lift was rebuilt and tested on the same day.
Read the job