17-HOUR DAY: DOOR FRAME, OSG, AND STAIR SCAFFOLD REPAIRS

WHAT THE JOB INVOLVED
A demanding 17-hour day across multiple sites. A damaged door frame was refixed, an OSG replaced on a Motala MC2000 lift, and a stair scaffold repair carried out on a home lift. Each repair was completed to manufacturer specification, tested, and returned to service before the day ended.
RESULT
Three complex repairs finished and lifts returned to service in a single day.
ON SITE



Service
Manufacturer
SIMILAR JOBS
CommercialMotala MC2000 Gearbox Replacement
Full gearbox replacement on a Motala MC2000 lift. After isolating the lift and securing it at the top floor, the motor and original gearbox were removed, all key surfaces cleaned and re-greased, and the new gearbox installed. The lift was rebuilt and tested on the same day.
Read the job
CommercialMotala MC2000 OSG Replacement (One-Day Turnaround)
Motala MC2000 overspeed governor replacement completed in under a day. Full Motala safety gear solution delivered to site, with diagnostics, removal, and refit all carried out within a single working day to keep downtime to a minimum.
Read the job
CommercialMotala MC2000 Monday Morning Diagnosis
Monday morning callout to a Motala MC2000 lift marked out of service. After 3.5 hours of travel, the fault was diagnosed and rectified within 30 minutes on site, and the lift returned to full service.
Read the job