TWO TRAILING CABLE REPLACEMENTS IN ONE DAY

WHAT THE JOB INVOLVED
Trailing cable replacement on two separate lifts in a single day. The first was a single-phase lift with an inverter, the second a three-phase lift without. Both cables were inspected, removed, and replaced before functional testing and return to service. Both jobs finished ahead of schedule.
RESULT
Two lifts returned to service in a single day, both ahead of schedule.
ON SITE


Service
SIMILAR JOBS
CommercialBarduva SB200 Inverter Replacement
Inverter replacement on a Barduva SB200 lift. The faulty inverter was removed, the new unit fitted and wired in, and a full calibration run completed before the lift was tested and returned to service.
Read the job
CommercialMotala MC2000 Gearbox Replacement
Full gearbox replacement on a Motala MC2000 lift. After isolating the lift and securing it at the top floor, the motor and original gearbox were removed, all key surfaces cleaned and re-greased, and the new gearbox installed. The lift was rebuilt and tested on the same day.
Read the job
ResidentialAcorn 180 Stairlift Overhaul
Overspeed governor (OSG) replacement and full service on an Acorn 180 stairlift at a private residence. A new OSG was installed alongside a complete clean of the pinion and the full roller assembly. The unit was tested and returned to operation the same afternoon.
Read the job